Go top
Conference paper information

Mathematical programming approach to underground timetabling problem for maximizing time synchronization

A. Ramos, M. Peña, A. Fernández-Cardador, A.P. Cucala

XI Congreso de Ingeniería de Organización / International Conference on Industrial Engineering and Industrial Managment - CIO 2007, Madrid (Spain). 05-07 September 2007


Keywords: Train timetabling problem, train scheduling, energy saving.


Published in XI Congreso de Ingeniería de Organización, pp: 1395-1405, ISBN: 978-84-611-8244-2

Publication date: 2007-09-07.



Citation:
A. Ramos, M. Peña, A. Fernández-Cardador, A.P. Cucala, Mathematical programming approach to underground timetabling problem for maximizing time synchronization, XI Congreso de Ingeniería de Organización / International Conference on Industrial Engineering and Industrial Managment - CIO 2007, Madrid (Spain). 05-07 September 2007. In: XI Congreso de Ingeniería de Organización: Actas. Madrid, 5-7 de Septiembre de 2007, ISBN: 978-84-611-8244-2


    Research topics:
  • *Energy Efficient Timetabling and Train Driving (Ecodriving)

Request Request the document to be emailed to you.